Project Overview

Location
Greensboro, N.C.

General Contractor
Samet/Barton Malow/SRS TriVenture

Architect
HDR Engineering

Length of Project
15 months

Scope
92,337 sq. ft.

N.C. A&T Joint School Of NanoScience & NanoEngineering

  • 3,000-amp 480/277-volt service
  • 400-kilowatt natural gas generator and ATS switches
  • Clean room laboratories
  • LEED Gold building
  • Programmable low voltage lighting control/dimming system
  • Explosion-proof labs
  • Site lighting
  • Teaching auditorium with lighting controls and A/V equipment
  • Cable tray installed above ceiling and below raised floors
  • Fire alarm, security and data/communication systems
  • Lightning protection and ground loop